Roof

Both wall plates on the block walls now.

Braced both end pattern trusses for gables to be built.

POSTED BY MCL BUILDING AND CIVIL ENGINEERING LIMITED AT 3:24 PM
Dry week

Don't want to speak to soon, but its been dry all week so far.

Both wall plates bedded on, roof trusses going on on Friday hopefully?

POSTED BY MCL BUILDING AND CIVIL ENGINEERING LIMITED AT 5:13 PM
Pricing

Forgot to say!!!

Last week received two sets of tenders, one from RJ McLeod and one from Jones Bros, both for different jobs.

Also received a tender from Land Engineering this week.

Going to be a busy week looking at figures and computer screens!!

POSTED BY MCL BUILDING AND CIVIL ENGINEERING LIMITED AT 12:53 PM
Progress

Sun is shining at Dungavel today.

Brickies getting on well as are the scaffolders.

Started a small repair job at Glenkerie wind farm for I&H Brown today.

POSTED BY MCL BUILDING AND CIVIL ENGINEERING LIMITED AT 12:22 PM
Stopped raining

Its not raining for the time being.

How long will this last?

Progress is being made at a better pace now the rain has stopped.

POSTED BY MCL BUILDING AND CIVIL ENGINEERING LIMITED AT 1:06 PM
Rain again

Heavy rain at Dungavel, again.

No building taking place today.

Just need a break from the rain for a week to catch up.

POSTED BY MCL BUILDING AND CIVIL ENGINEERING LIMITED AT 10:31 AM
Building again

After last weeks horrible weather.

We can start building again as it is staying dry.

For the time being?!!!

POSTED BY MCL BUILDING AND CIVIL ENGINEERING LIMITED AT 3:47 PM
WOW, what weather

What can I say?

Not a lot done this week due to the terrible weather.

Behind program now, pressure on.

POSTED BY MCL BUILDING AND CIVIL ENGINEERING LIMITED AT 7:57 PM
Out of the ground

Started superstructure block work at Dungavel wind farm today.

Stripping floor slab shutters and re covering trenches.

Finished floor slab looks really good.

POSTED BY MCL BUILDING AND CIVIL ENGINEERING LIMITED AT 4:23 PM
Big Mile Stone

Poured main floor slab at Dungavel wind farm control building yesterday.

The lads worked through the night to get a nice smooth power float finish on the concrete.

POSTED BY MCL BUILDING AND CIVIL ENGINEERING LIMITED AT 4:33 PM

.