Off for a fortnight
That's it, all doors fitted at Dungavel.
Target reached.
Big thanks to all the lads who have worked so hard this year.
Thank you to all our clients who keep us busy all year.
See you all in the 2015.
POSTED BY MCL BUILDING AND CIVIL ENGINEERING LIMITED AT 1:11 PM
Pricing
Received tender docs from Land Engineering ltd for a job in East Kilbride.
POSTED BY MCL BUILDING AND CIVIL ENGINEERING LIMITED AT 4:01 PM
Tis was the night before!!!
Doors getting fitted at Dungavel.
Elevation scaffolds dismantled.
Decoration partially complete.
On target for wind and water tight and secure for Xmas break.
POSTED BY MCL BUILDING AND CIVIL ENGINEERING LIMITED AT 3:59 PM
The final week
Painters started inside on Monday at Dungavel wind farm.
Plasterers have scratch coated and smooth coated walls ready for wet dash tomorrow.
Had a meeting in Carlisle today with Story construction about a job next year.
POSTED BY MCL BUILDING AND CIVIL ENGINEERING LIMITED AT 6:45 PM
Its nearly Xmas
It feels like Xmas now!!!!
Lots of snow at Dungavel.
Really holding the job up now.
Inside works complete as far as possible.
POSTED BY MCL BUILDING AND CIVIL ENGINEERING LIMITED AT 7:51 PM
Wicked weather
Good old Brit weather.
Its been absolutely terrible with rain and wind at Dungavel today.
Not a lot done on site.
POSTED BY MCL BUILDING AND CIVIL ENGINEERING LIMITED AT 7:30 PM
Pricing
Raymond Brown sent an enquiry for a job today.
I&H Brown talking to us about a job close to home.
Meeting with CA Blackwell on Monday 8th about a job to start in new year.
POSTED BY MCL BUILDING AND CIVIL ENGINEERING LIMITED AT 8:42 PM
Closing stages
Roof water wind and water tight at Dungavel.
Plasterers skimmed ceiling.
Really taking shape now.
POSTED BY MCL BUILDING AND CIVIL ENGINEERING LIMITED AT 8:40 PM
Finishing works
Plasterboard and loft insulation are getting fixed at Dungavel wind farm today.
Plasterer booked in for this Friday to skim ceiling.
Half of roof loaded with tiles.
Lots going on, trying to get building wind and water tight for Friday 19th Dec.
POSTED BY MCL BUILDING AND CIVIL ENGINEERING LIMITED AT 9:48 PM
Another week
Roof trusses up, sheeted and loaded with tiles at Dungavel wind farm.
Received tender documents from Jones Bros for a job for next year.
POSTED BY MCL BUILDING AND CIVIL ENGINEERING LIMITED AT 7:58 PM