  SCOTTS CONCRETE SLABS
No Image
SITE NAME - SCOTTS PEAT WORKS JOB DESCRIPTION - LAY REINFORCED CONCRETE SLABS AND DRAINAGE REPAIRS LOCATION - SPRINGFIELD CLIENT - SCOTTS PEAT PRINCIPAL CONTRACTOR - MCL BUILDING AND CIVIL ENGINEERING LTD DURATION - 4 WEEKS CONCRETE POURED - 200M3 STRUCTURAL FIBRE ... read more
  BIO OIL FUEL PLANT - CIVILS
.
SITE NAME - BUSLINGTHORPE GREEN JOB DESCRIPTION - DUCT INSTALL, RE BAR FIX, SHUTTERING, CONCRETING AND BLOCK LAYING LOCATION - LEEDS CLIENT - PRINCIPAL CONTRACTOR - FREEDOM/AGRILEK DURATION - 8 WEEKS CONCRETE LAID - 40M2 ... read more
  HIGH HARRINGTON HOUSING SCHEME
No Image
SITE NAME - HIGH HARRINGTON HOUSING SCHEME JOB DESCRIPTION - RE BAR FIX AND FORMWORK FOR DEEP MANHOLES, ACCESS STAIRS, TRANSFORMER PLINTHS AND FITMENTS LOCATION - HIGH HARRINGTON, CUMBRIA CLIENT - ARMSTRONG HOMES PRINCIPAL CONTRACTOR - GBS DURATION - 26 WEEKS FORMWORK / TONNAGE - 400M2 / 6T   ... read more
  GORDONSTOWN WIND FARM
.
SITE NAME - GORDONSTOWN WIND FARM JOB DESCRIPTION - RE BAR FIX AND PERMANENT FORMWORK TO 4NO. TURBINE BASES LOCATION - KIRKTON OF AUCHTERLEES CLIENT - INFINNIS PRINCIPAL CONTRACTOR - JONES BROS DURATION - 6 WEEKS TONNAGE - 414T ... read more
  EWE HILL 16 WIND FARM
No Image
SITE NAME - EWE HILL 16 WIND FARM JOB DESCRIPTION - CASTING 16NO. REINFORCED CONCRETE TRANSFORMER BASES AND 16NO. STAIR BASES LOCATION - NR LOCKERBIE CLIENT - SCOTTISH POWER RENEWABLES PRINCIPAL CONTRACTOR - I&H BROWN DURATION - 10 WEEKS CONCRETE POURED - 176M3 ... read more
  SOWERBY WOOD RECYCLE CENTRE
.
SITE NAME - SOWERBY WOOD RECYCLING CENTRE JOB DESCRIPTION - RE BAR FIX AND SHUTTERING TO BASES, WALLS, SOFFITS, GROUND BEAMS AND PILE CAPS LOCATION - BARROW CLIENT - SHANKS PRINCIPAL CONTRACTOR - HANSON CONTRACTING DURATION - 26 WEEKS FORMWORK / TONNAGE - 3500M2 / 220T ... read more