Contract Examples

  BLYTHE HARBOUR WIND FARM
.
THIS PROJECT IS LOCATED IN THE NORTH-EAST OF ENGLAND.  THE PROJECT ITSELF WAS A ONE-OFF KEMPER WATERPROOFED BASE TO A REPOWER TURBINE.   WE HAD TO USE GAS BOTTLES AND BLOW TORCHES TO DRY THE CONCRETE SURFACE, WE THEN APPLIED THE PRIMER AND QUARTZ SAND.  THE CLOTHS WERE CUT READY FOR USE.  WHEN WE CAME TO MIX THE KEMPER FOR THE MAIN WATERPROOFING WORKS BECAUSE WERE WORKING SO CLOSE TO THE COAST AND A WATERWAY WE USED A PLANT NAPPY (WHICH WOULD NORMALLY BE USED FOR COMPRESSORS) FOR MIXING ALL WATERPROOFING.  THIS HELPED REDUCE THE RISK OF ANY ENVIRONMENTAL CONTAMINATION TO THE WATERWAYS AND SURROUNDING GROUNDS. ... read more
  SEAMER WIND FARM
.
SITE NAME - SEAMER WIND FARM JOB DESCRIPTION - KEMPER WATERPROOFING TO 4NO. SENVION TURBINES LOCATION - STOCKTON ON TEAS CLIENT - GDF SUEZ PRINCIPAL CONTRACTOR - RAYMOND BROWN DURATION - 1 WEEK COVERAGE - 200M2 ... read more
  GOOLEFIELDS WIND FARM
.
THIS PROJECT WAS LOCATED IN GOOLE, NORTH YORKSHIRE. FARRANS WERE A NEW PRINCIPAL CONTRACTOR TO OURSELVES AND WE FOUND THEM TO VERY PROFESSIONAL AND GOOD TO WORK WITH. THE LOCATION OF THE WIND FARM ITSELF IS ON FLAT LOW LYING LAND WITH A HIGH WATER TABLE.  THERE WERE 16 WIND TURBINE BASES TO BE WATERPROOFED USING KEMPER.   WE HAD TO USE GAS BOTTLES AND BLOW TORCHES TO DRY THE CONCRETE SURFACE, WE THEN APPLIED THE PRIMER AND QUARTZ SAND.  THE CLOTHS WERE CUT READY FOR USE.  WHEN WE CAME TO MIX THE KEMPER FOR THE MAIN WATERPROOFING WORKS WE USED A PLANT NAPPY (WHICH WOULD NORMALLY BE USED FOR COMPRESSORS) FOR MIXING... read more
  SWINFORD WIND FARM
.
SITE NAME - SWINFORD WIND FARM JOB DESCRIPTION - CONSTRUCTION OF TRADITIONAL CONTROL BUILDING LOCATION - RUGBY CLIENT - PRINCIPAL CONTRACTOR - JONES BROS DURATION - 12 WEEKS FLOOR AREA - 114M2 ... read more
  HALL WIND FARM
.
SITE NAME - HALL WIND FARM JOB DESCRIPTION - CONSTRUCTION OF TRADTIONAL CONTROL BUIDLING LOCATION - BEVERLEY CLIENT - RIDGEWIND PRINCIPAL CONTRACTOR - JONES BROS DURATION - 10 WEEKS FLOOR AREA - 118M2 ... read more
  WESTFIELD WIND FARM
.
SITE NAME - WESTFIELD WIND FARM JOB DESCRIPTION - CONSTRUCTION OF TRADITIONAL CONTROL BUILDING LOCATION - KINROSS CLIENT - INFINNIS PRINCIPAL CONTRACTOR - RJ MCLEOD DURATION - 10 WEEKS FLOOR AREA - 186M2 ... read more
  FALLAGO RIG WIND FARM
.
SITE NAME - FALLAGO RIG WIND FARM JOB DESCRIPTION - CONSTRUCTION OF PROTAL FRAME AND TRADITIONAL CONTROL BUILDING LOCATION - DUNS CLIENT - EDF-ER PRINCIPAL CONTRACTOR - RJ MCLEOD DURATION - 12 WEEKS FLOOR AREA - 292M2 ... read more
  NETHER HALL
No Image
SITE NAME - NETHER HALL JOB DESCRIPTION - KEMPER WATERPROOFING TO EWT TURBINE LOCATION - DOUGLAS WATER CLIENT - G2 ENERGY PRINCIPAL CONTRACTOR - G2 ENERGY DURATION - 2 DAYS COVERAGE - 20M2 ... read more
  COUPLAW
No Image
SITE NAME - COUPLAW JOB DESCRIPTION - KEMPER WATERPROOFING TO EWT TURBINE LOCATION - BLACKWOOD CLIENT - G2 ENERGY PRINCIPAL CONTRACTOR - G2 ENERGY DURATION - 2 DAYS COVERAGE - 20M2 ... read more
  NORTON FIELDS
No Image
SITE NAME - NORTON FIELDS JOB DESCRIPTION - KEMPER WATERPROOFING TO EWT TURBINE LOCATION - WORCESTER CLIENT - G2 ENERGY PRINCIPAL CONTRACTOR - G2 ENERGY DUARTION - 2 DAYS COVERAGE - 20M2 ... read more

.

© 2024 MCL Building & Civil Engineering LTD | T&Cs | Privacy